Two wooden cable-stayed bridges in Roermond with Azobé

We have realized two new wooden cable-stayed bridges for the Municipality of Roermond. The bridges are completely sawn and planed to the client's design. The design included wooden posts, railings and handrails.

Type of wood application: Bridge
Place: Roermond
Wood type(s): Ekki
Quality mark: FSC 100%
Client: Municipality of Roermond
Executing party(s): Flora Nova
Volume: 57 m3
CO2 capture: The wood in this project has more than 93,154 KG CO2 eq. recorded for the entire duration of use.
A nice article has been written about this project about the design, realization, prefabrication and transport. Read the article here.

Photo Impression